Contractors in Boulder City, Nevada
Clark County • Population: 14,884
Showing 24 verified contractors
π Roofing in Boulder City
ποΈFencing in Boulder City
πͺWindows & Doors in Boulder City
Quick answer
Boulder City's Community Development Department issues building permits through an online portal and answers at 702-293-9282. Its May 2026 exempt list lets you skip a building permit for fences up to 4 feet without permanent foundations, retaining walls up to 24 inches and same-class re-roofs with no sheathing work, though several items still need zoning review. The growth control ordinance mainly affects houses built to sell, not owner-occupants.
Boulder City limits new construction through a growth control ordinance, and it keeps building and planning under one Community Development Department. If you are hiring a contractor for a remodel, re-roof or yard project, the details that matter are the city's own exempt-work list and the zoning review that rides along with several "exempt" items.
Who issues building permits
The Boulder City Community Development Department reviews building plans for compliance with the International Building Codes and locally adopted codes, inspects permitted work, and issues certificates of occupancy. Its planning staff also review every building permit for zoning compliance. The department's phone is 702-293-9282.
Per the city's Building Permits page:
- Applications are completed online through the city's permit portal, using the submittal checklist for your project type.
- Once plans are approved, you receive a separate email with the remaining permit fee.
- Approved permits are issued 1 to 2 business days after payment is received.
Work exempt from a building permit
Boulder City publishes its own Work Exempt from Building Permit list, dated May 21, 2026. Items marked (1) on the list still need zoning review. Highlights for a house:
| Exempt from a building permit | Zoning review? |
|---|---|
| One-story detached shed or playhouse up to 200 sq ft | Yes |
| Fence with no permanent foundation (wood, vinyl, chain-link) up to 4 ft high | Yes |
| Retaining wall up to 24 inches, top of footing to top of wall | No |
| Detached deck up to 200 sq ft, no more than 30 inches above grade, not serving an exit door | Yes |
| Walks and driveways up to 30 inches above grade | Yes |
| Fabric shade, carport or wood gazebo up to 120 sq ft, not on a permanent foundation | Yes |
| Painting, flooring, cabinets, countertops and similar finish work | No |
| Same-size, same-type window or door replacement with no framing change | No |
| Re-roof with same or higher class, same or lighter material, no sheathing replaced | No |
| Stucco or drywall repair up to 30 sq ft not tied to another permit | No |
The electrical side exempts like-for-like light fixture replacement and low-voltage wiring of 50 volts or less in a single-family home. The mechanical side exempts portable heaters, coolers and evaporative coolers. Anything past those lines, such as a new circuit, a ducted AC replacement or a block wall, goes through the permit portal. On a residential job, the contractor must obtain the necessary permits (NRS 624.970).
The growth control ordinance
Boulder City's growth control FAQ explains that the Controlled Growth Management Plan (Chapter 41 of Title 11) applies only if you plan to build a house you intend to sell, not live in, and to all apartments, multifamily condominiums and hotels. Builders in that group contact the City Planner to apply for an allotment. The ordinance also technically covers owner-builders on lots created since 1996, but those requests are counted toward the annual total and can be approved at staff level.
Allotment requests are rated by the city's Allotment Committee, a seven-member body with two-year terms created by the growth control ordinance. Community Development staff review all construction requests so the statutory limits are not exceeded. For a remodel, addition or re-roof on your existing home, no allotment is involved.
If you plan to build your own house on a vacant lot, read the state owner-builder exemption too: NRS 624.031 requires an application to the State Contractors' Board, and selling within a year raises a presumption that the house was built for sale.
Water rules
Boulder City Municipal Code Section 9-8-17 prohibits waste of water, and SNWA's laws and ordinances page lists it alongside the other valley ordinances. SNWA's water waste page sends Boulder City reports to the city's Public Works contact form. The SNWA watering calendar applies to all municipal water customers: assigned days, no Sunday sprinkler watering, and no irrigation from 11 a.m. to 7 p.m. from May 1 through August 31. Have your landscaper set any new controller to those rules.
Contractor licenses and home businesses
Every contractor bidding your job needs an active Nevada State Contractors' Board license (NRS 624.700). Look it up on NSCB License Search, and read our licensing guide for classifications. If a trade contractor runs the business from a Boulder City home, the city's FAQ points to Chapter 29 of Title 11 for home occupations and to the Economic Development Coordinator at 702-293-9393 for business license questions.
Weather
The National Weather Service does not publish an annual climate report for Boulder City, so this page leaves out local temperature normals. Plan roofing and AC work around the southern Nevada summer heat.
Find contractors in Boulder City
Browse Boulder City plumbers, electricians, HVAC companies in Boulder City, remodelers, landscapers in Boulder City, painters and concrete contractors.
Check bids against our painting costs and landscaping costs, work through the hiring checklist, and get quotes.
Sources
- Boulder City: Community Development
- Boulder City: Building Permits
- Boulder City: Work Exempt from Building Permit, May 21, 2026 (PDF)
- Boulder City FAQ: How does the city's growth control ordinance apply to me?
- Boulder City: Allotment Committee
- SNWA: Understand Laws and Ordinances
- SNWA: Water Waste
- SNWA: Change Your Irrigation Clock
- Nevada Revised Statutes, Chapter 624
- NSCB License Search
Frequently asked questions
Does Boulder City's growth control ordinance affect my remodel?
The city says the Controlled Growth Management Plan, Chapter 41 of Title 11, only affects you if you build a house to sell rather than live in, plus all apartments, multifamily condominiums and hotels. Owner-builders on lots created since 1996 are counted toward the annual total and can be approved at staff level. A remodel of an existing home is not an allotment request.
Do I need a permit for a fence in Boulder City?
Not a building permit for a fence without a permanent foundation, such as wood, vinyl or chain-link, up to 4 feet high at any point. The city's exempt list marks fences for zoning review, so check setbacks and height rules with Planning first. Taller fences and masonry walls need a permit.
How fast does Boulder City issue a permit after approval?
The city says approved permits are issued 1 to 2 business days after it receives the permit payment. You get a separate email with the remaining fee balance once plans are approved.