This checklist takes a Nevada homeowner from the first call to the final payment. Each step names the statute, regulation or NSCB guidance behind it, so you can tell what the contractor must do from what is good practice. For licensing background, start with the Nevada contractor licensing guide.
Step 1: Plan the job
- Write down the work, the finished result and your budget. Decide whether it is one trade (a roof, a water heater) or several (a kitchen remodel).
- One trade can go to a specialty licensee. A job that needs more than two unrelated trades is general building work for a B licensee acting as prime contractor (NRS 624.215).
- Check typical prices in our Nevada cost guides, such as roofing, HVAC and remodeling, so an outlier bid stands out.
Step 2: Get at least three written bids
- NSCB's Consumer Checklist says get at least three bids and three references, and review past work.
- Make sure every bid covers the same scope (NSCB Home Improvement Bill of Rights).
- Only licensees may bid. Submitting a bid without a license is unlawful (NRS 624.700). Every bid must show the license number and monetary limit (NAC 624.640(5)).
Step 3: Verify the license, classification and limit
Search NSCB License Search by license number, company name, or principal. Then check:
- Status is active. Contracting on a suspended, revoked or inactive license is cause for discipline (NRS 624.302).
- Classification fits. Roofing is C-15a, plumbing C-1d, water heaters C-1h, air conditioning C-21, electrical C-2, rooftop solar C-2g, painting C-4, landscaping C-10, fencing C-25, pools A-10. A B-7 remodeler can't add square footage (NAC 624.170). See license classifications.
- Monetary limit covers the price. The limit applies to all contracts for you on your site combined. A contract over it is void (NRS 624.220, NAC 624.640). See monetary limits.
- Name matches. The company on the contract, the truck and the license should be the same business. Licensees must display name and license number on commercial vehicles (NRS 624.288).
- Discipline history. Check NSCB Discipline Search.
- Pre-1978 home? Ask for the firm's EPA lead-safe certification (EPA RRP). See lead-safe rules.
Is the job small enough for an unlicensed handyman? Only if it is repair or maintenance under $1,000, needs no permit, isn't plumbing, electrical or HVAC, and isn't part of a $500+ project (NRS 624.031(6)). See handyman exemption.
Step 4: Check insurance and bonds
- Workers' compensation. NSCB requires proof of industrial insurance or a no-employees affidavit for licensing (NRS 624.256). Ask for the current certificate.
- General liability. Not required by chapter 624. Ask for a certificate naming the insurer, then call the insurer.
- License bond. Every licensee has one of $1,000 to $500,000 (NRS 624.270). If the contractor wants more than the deposit cap in Step 6, ask whether it has the $100,000 consumer protection bond; NSCB says you can check bond status on its website (Consumer Checklist).
Step 5: Watch for red flags
NSCB's Traveling Contractors Scams and Residential Solar pages list:
- Door-to-door offers to start right away, often after storms
- "Leftover material from another job"
- No up-front price or written contract, and prices that grow mid-job
- Cash only, or checks cashed immediately
- Out-of-state plates, toll-free numbers, P.O. boxes instead of street addresses
- Free inspections that "find" problems
- Solar sellers who say they "hire" or "work with" a local licensed installer
If you sign at your door, Nevada gives you until midnight of the third business day to cancel (NRS 598.230). See door-to-door right to cancel.
Step 6: Get the contract in writing
For work on your owner-occupied single-family home, NRS 624.970 requires:
- Contractor name, address, license number and monetary limit
- Your name, mailing address and the property address
- Date signed and estimated completion date
- Description of the work, and for new work, a plan and scale drawing with materials and equipment
- Total price including taxes
- Down payment no more than $1,000 or 10 percent, whichever is less (unless the $100,000 bond applies)
- Payment schedule in dollars and cents by stage of construction
- Statement that changes need a written change order with scope and price
- Statement that you received the Recovery Fund notice and the lien informational form
- Places for your initials, and a notice that you may contact NSCB, request a payment and performance bond, consult an attorney, and get the contract in the language it was explained in
- At least 10-point bold type
At signing you get a copy of everything and a signed receipt for any money paid. Pools and solar have their own lists: pool and spa rules, solar rules. Full detail: residential contract requirements.
Step 7: Keep the deposit small and pay as work is done
- The deposit cap above is the law for owner-occupied homes.
- The schedule may never let the contractor receive more than 100 percent of the value of work performed, apart from the deposit (NRS 624.970(2)(k)).
- NSCB's Consumer Checklist: don't let payments get ahead of the work, keep a record of all payments, don't pay cash, and don't make the final payment until you are satisfied.
- Pay by check or card so you have a record. The Recovery Fund asks for front and back copies of canceled checks (NAC 624.750).
Step 8: Let the contractor pull the permit
- On an owner-occupied home, the contractor must obtain all necessary permits (NRS 624.970(6)).
- If you pull the permit yourself, you lose eligibility for the Residential Recovery Fund (NRS 624.510(2)(d)).
- Permits come from your city inside city limits and from the county in unincorporated areas. See building permit requirements and your city page, such as Las Vegas, Henderson or Reno.
Step 9: Protect yourself from liens
- A general building contractor must give you the names and license numbers of its subcontractors and of suppliers furnishing $500 or more of material, plus NSCB's lien informational form (NRS 624.600).
- Keep every notice of right to lien you receive (NRS 108.245). It tells you who could lien your home.
- Before each payment, collect conditional lien waivers on the statutory forms from the contractor and from anyone who sent a notice; after payment clears, collect the unconditional ones (NRS 108.2457).
- A 15-day notice of intent to lien means someone says they are owed money (NRS 108.226(6)). Stop and sort it out before the next payment.
See mechanics' lien law and notice of right to lien.
Step 10: During the project
- Put every change in a written change order with the price before the work is done. An unsigned change order is not enforceable against you (NRS 624.970(2)(i)).
- Keep a job file: contract, change orders, payment records, lien notices and waivers, delivery dates and photos (NSCB Home Improvement Bill of Rights).
- Abandoning a job, or failing to work with reasonable diligence, is cause for discipline (NRS 624.301).
Step 11: Finishing up
- Confirm final inspections passed before final payment.
- Get unconditional final lien waivers from the contractor and every notice sender.
- Consider recording a notice of completion with the county recorder. It shortens the time to record a lien from 90 days after completion to 40 days after the notice, but only if you mail copies within 10 days as NRS 108.228 requires.
- Keep the file. The Board's complaint deadline is 4 years from the act or omission (NRS 624.331).
If something goes wrong
- Put the problem in writing to the contractor.
- File an NSCB complaint. An investigator may visit and order corrections.
- Claim on the contractor's bond within 2 years of the act.
- Apply to the Residential Recovery Fund, up to $40,000.
- If the contractor was unlicensed, see penalties for unlicensed contracting.
Ready to find a contractor?
Request bids through get quotes or browse the directory by trade: roofers, plumbers, electricians, HVAC, remodelers, landscapers and painters.
Sources
- NRS 624.031, 624.215, 624.220, 624.256, 624.270, 624.600, 624.700, 624.970
- NRS 108.226, 108.228, 108.245, 108.2457
- NRS 598.230 Door-to-door sales
- NAC 624.640, 624.170, 624.750
- NSCB: Consumer Checklist
- NSCB: Home Improvement Bill of Rights
- NSCB: Traveling Contractors Scams
- NSCB: Residential Solar
- NSCB License Search
- EPA: Lead RRP Program
Frequently Asked Questions
What should I check before hiring a contractor in Nevada?
Search NSCB License Search by license number or company name. Confirm the license is active, the classification covers the work (for example C-15a for roofing, C-21 for air conditioning, C-1 for plumbing), and the monetary limit covers your contract price. Check NSCB Discipline Search, and for a pre-1978 home, ask for EPA lead-safe certification.
How much deposit can a Nevada contractor ask for?
On an owner-occupied single-family home, no more than $1,000 or 10 percent of the contract price, whichever is less, unless the contractor has filed a $100,000 consumer protection bond with NSCB or was relieved of the license bond (NRS 624.970(2)(g)).
What are red flags when hiring a Nevada contractor?
NSCB's tip sheet lists door-to-door solicitation, claims of leftover material from another job, reluctance to give a written price or contract, demands for cash, out-of-state plates and toll-free numbers, and free inspections that turn up problems. For solar, NSCB adds a salesperson who says the company 'works with' a local licensed installer.
Do I get a copy of the contract in Nevada?
Yes. When you sign, the contractor must give you a legible copy of all documents you signed and a signed receipt for any money you paid (NRS 624.970(4)).