Every Nevada contractor's license has a dollar ceiling. The monetary limit is the largest job the contractor may take for one client on one site. A licensed contractor with the right classification but too small a limit is still the wrong contractor for your project. This page explains how the limit works, where to find it, and what happens when a contract goes over it.
What the law says
NRS 624.220(2) requires the State Contractors' Board to limit each contractor by "establishing a monetary limit on a contractor's license." The limit "must be the maximum contract a licensed contractor may undertake on one or more construction contracts on a single construction site or subdivision site for a single client."
Three things follow from that wording:
- It is per client, per site. Your house is one site and you are one client.
- Several contracts count together. "One or more construction contracts" means a contractor can't write your $90,000 remodel as three $30,000 contracts to fit a $40,000 limit.
- The Board sets it from the contractor's finances. The limit is set after the Board weighs the factors in NRS 624.260 to 624.265, which cover experience, financial responsibility and character.
How NSCB sets the limit
NSCB's Raise Your License Limit page says any change to a limit requires a financial statement that meets the Board's financial responsibility rules. The level of review rises with the limit requested:
| Limit requested | Financial statement NSCB requires |
|---|---|
| $25,000 or less | CPA-prepared statement, a statement on the Board's form, or a software-prepared balance sheet with an affidavit |
| More than $25,000 but less than $500,000 | CPA-compiled statement (current within 6 months), or reviewed or audited statement (within 1 year) |
| $500,000 or more but less than $1,000,000 | CPA-compiled statement with full disclosures, or reviewed or audited statement |
| $1,000,000 or more | Reviewed or audited statement by an independent CPA |
A small limit is normal for a new or small firm. What matters to you is whether the limit covers your contract price.
Raising the limit for one project
A contractor may ask the Board to raise its limit permanently or for a single project (NRS 624.220(3)). A single-project request must be filed at least 5 working days before the contractor bids, and the Board must approve it before the bid goes in. A licensee may file no more than five single-project requests in any 12 months, and the Board may require a performance or payment bond as a condition (NAC 624.670).
If a contractor tells you "the Board will raise my limit after we sign," the statute's order is the reverse: approval comes first.
What happens when a contract is over the limit
- The contract is void. "If a licensee bids or contracts outside the scope of his or her license or exceeds the monetary limit placed on the license, the bid or contract is void" (NAC 624.640(1)).
- The contractor faces discipline. Bidding or contracting for one project above the limit is cause for discipline (NRS 624.3015(2)), with fines of up to $50,000 per violation (NRS 624.300(3)).
- Your Recovery Fund claim can suffer. NSCB says Recovery Fund claims "may also be denied if the contract was outside the scope of the contractor's license classification or exceeded the contractor's monetary license limit in effect at the time the contract was entered into" (NSCB Residential Recovery Fund).
- Solar financing. A solar loan, lease or power purchase agreement is voidable by the homeowner for 3 years if the financier failed to make sure the installer was licensed and acting within its monetary limit (NRS 598.982143).
Where the limit appears
- NSCB License Search. Look up the license on NSCB License Search.
- Bids and contracts. Each licensee must include its license number and any monetary limit in all bids and contracts (NAC 624.640(5)).
- Residential improvement contracts. A contract with the owner-occupant of a single-family home must list the contractor's license number "and the monetary limit on that license" (NRS 624.970(2)(a)). Pool and solar contracts have the same rule.
A quick check before you sign
- Write down your total contract price, including change orders you expect and taxes.
- Look up the license and read the limit.
- If the price is near or above the limit, ask the contractor to show NSCB's written approval of a single-project increase.
- Check that the classification fits the work, too. See Nevada contractor license classifications.
Related pages
- Nevada contractor licensing guide
- Nevada residential contract requirements
- Nevada contractor bond requirements
Sources
- NRS 624.220 Monetary limit on license
- NRS 624.300 Disciplinary actions
- NRS 624.3015 Bidding in excess of limit
- NRS 624.970 Residential improvement contracts
- NRS 598.982143 Solar financier license check
- NAC 624.640 and 624.670
- NSCB: Raise Your License Limit
- NSCB: Residential Recovery Fund
Frequently Asked Questions
Where do I find a Nevada contractor's monetary limit?
On the contractor's record in NSCB License Search, and on the contract itself. NRS 624.970 requires a residential improvement contract to state the license number and the monetary limit, and NAC 624.640(5) requires both on every bid and contract.
What if my contract is bigger than the contractor's limit?
NAC 624.640(1) says a bid or contract that exceeds the monetary limit is void. Bidding or contracting above the limit is also cause for discipline under NRS 624.3015(2). A contractor can ask NSCB for a single-project increase, but it must be approved before the bid (NRS 624.220(3)).
Can a contractor split my job into several contracts to stay under the limit?
The limit applies to one or more construction contracts on a single site for a single client (NRS 624.220(2)), so several contracts for your one house count together.