ποΈSiding in Reno
Quick answer
Inside Reno city limits, the City of Reno Development Services Department issues building permits, and every application is filed online at OneNV.us. Reroofs, HVAC replacements, water heaters, panel changes and replacement windows are EZ permits that need no plans; fences, sheds, patio covers, pools and remodels need plans and a 10-day review. Reno addresses outside city limits permit through Washoe County.
A Reno mailing address can sit inside the City of Reno, inside the City of Sparks, or in unincorporated Washoe County, and each one runs its own permit counter. Washoe County's business license page links a jurisdiction map that colors Reno red, Sparks green and unincorporated county yellow. Check your parcel before you take bids, because the permit list, the inspectors and the contractor's local license all follow that line.
Who issues permits inside Reno
The City of Reno Development Services Department handles building permits inside city limits. Its building permit page says every application is submitted electronically on the ONE Regional Licensing and Permitting portal at OneNV.us, where you also check status, pay fees and schedule inspections. Permit Services answers at 775-334-2063.
Reno adopted the 2024 building codes and the 2023 National Electrical Code on July 1, 2025. Since January 1, 2026 the city accepts plans only under the 2024 editions.
A permit expires if no inspection passes, or partially passes, within 180 days. Contacts on an active permit can request a one-time extension online 30 days before expiration for $135. If work was done before the permit was pulled, the city adds compliance fees to the normal fees.
EZ permits and plan permits
Reno's Building Permit Types sheet (updated June 1, 2026) splits house work into two groups.
EZ permits, no plans needed:
- Reroof
- HVAC replacement
- Water heater or boiler
- Electric service change
- Gas line or gas fireplace insert
- Sewer or water line replacement on private property
- Stucco or siding
- Windows and glass doors
- Lawn sprinklers
Plan permits, 10-day review: fence and shed, patio cover, pool and spa, garages and carports, remodels and additions, rockeries and retaining walls, grading, and demolition.
For work that needs no permit at all, the city points to Section R105.2 of the International Residential Code.
What inspectors check on EZ jobs
Reno's EZ permit requirements set a few lines worth knowing before you sign:
- Replacement windows need a U-factor of 0.30 or better, with labels in place at inspection.
- A roof recover isn't allowed over a roof that already has two or more layers, so those jobs are a full tear-off.
- Gas water heater and furnace change-outs need a manometer test by a holder of a Washoe County manometer tester card.
- Water heaters must be strapped in the upper and lower thirds of the tank.
- New electrical services for houses need a surge-protective device.
Journeyman cards and business licenses
Reno adds a trade-worker rule. The city's journeyman card page says electrical wiring and plumbing work inside Reno must be done by a person holding a valid journeyman certificate, with apprentices carrying a card from an approved program (Title 14 of the Reno Municipal Code). Ask the electrician or plumber whose card covers the crew on your job.
The city's business license FAQ says a contractor licensed by the State Contractors' Board must also hold a City of Reno business license to do business in Reno. The same page notes a contractor working across the region may need four licenses: the state's, Reno's, Sparks's and Washoe County's.
Contractor licenses
Every contractor who bids or performs work needs an active Nevada State Contractors' Board license (NRS 624.700). Search it on NSCB License Search, where the monetary limit is listed too; the Board's Reno office is at 5390 Kietzke Lane, Suite 102, (775) 688-1141. On a residential job, the contractor must apply for and obtain the required permits (NRS 624.970). Our licensing guide explains classifications, and the handyman exemption page covers small repairs.
TMWA water rules
The Truckee Meadows Water Authority says it serves 85 percent of the water customers in Reno, Sparks and Washoe County (TMWA topics). Its assigned-day watering plan applies to sprinklers only:
- Even last address digit: Tuesday, Thursday, Saturday
- Odd last address digit: Wednesday, Friday, Sunday
- No sprinklers on Mondays, and none from noon to 6 p.m. between Memorial Day and Labor Day
- Drip systems and hand watering are allowed any day
TMWA's water waste page says its Rule 2 allows penalties of up to $75 for repeated waste. Have your landscaper program new controllers to these days. The pipe between your house and the meter is the owner's to repair, per TMWA's service line page.
Weather
The National Weather Service's 2025 Reno climate summary lists 1991-2020 normals at Reno-Tahoe International Airport of 7.35 inches of precipitation, 20.9 inches of snow, 65.1 days at 90 degrees or hotter and 121.9 nights at or below freezing. The record high is 108 degrees. Freeze-thaw and summer heat both shape roofing, irrigation and AC work here.
Find contractors in Reno
Browse Reno plumbers, electricians, HVAC contractors in Reno, roofers, remodelers, landscapers, painters, fence builders, concrete contractors, window and door installers and gutter cleaning in Reno.
Compare prices with our roofing costs and HVAC costs, use the hiring checklist, and request quotes.
Sources
- City of Reno: Apply for a Building Permit
- City of Reno: Building Permit Types (PDF, 06/01/2026)
- City of Reno: EZ Permits General Requirements (PDF)
- City of Reno: Electrical / Plumbing Journeyman Cards
- City of Reno: Common Business Licensing Questions
- Washoe County: Business License
- TMWA: Assigned Watering Days
- TMWA: Report Water Waste
- TMWA: Service Line Coverage
- TMWA: Water Topics of Interest
- National Weather Service: Reno annual climate summary
- Nevada Revised Statutes, Chapter 624
- NSCB License Search
Frequently asked questions
Do I need a permit to replace windows in Reno?
Yes. The City of Reno lists windows and glass doors as an EZ permit for houses. EZ permits need no building plans. Reno's EZ requirements call for replacement windows with a U-factor of 0.30 or better, with the labels left on until the inspection.
Who checks gas water heater and furnace swaps in Reno?
The city inspects them under a water heater or HVAC EZ permit. Reno's EZ requirements say a gas water heater or furnace change-out needs a manometer test by someone holding a valid Washoe County manometer tester card, and the card number is given when the inspection is requested.
What happens if past owners did work without a permit?
Reno applies compliance fees on top of the normal permit fees when work was done before the required permit was secured. You apply for the permit the usual way through OneNV.us.
Which days can I run sprinklers in Reno?
TMWA customers with an even last address digit water Tuesday, Thursday and Saturday; odd addresses water Wednesday, Friday and Sunday. Mondays are off. TMWA asks for no sprinklers between noon and 6 p.m. from Memorial Day through Labor Day. Drip and hand watering are allowed any day.