βοΈHVAC in Yerington
π³Landscaping in Yerington
Quick answer
Inside Yerington city limits, the City of Yerington Building and Planning Department at 14 E. Goldfield Ave., 775-463-3511, issues building, electrical, plumbing, mechanical and demolition permits. The city requires every contractor and subcontractor to hold a City of Yerington business license, and no permit issues while Lyon County property taxes are delinquent. Outside city limits, Lyon County permits the work and the Walker River Irrigation District must approve site plans in Mason and Smith Valleys.
Yerington is a small incorporated city in Mason Valley, and it keeps its own Building Department, separate from the Lyon County Building Department that also has its office in Yerington. A Yerington address doesn't settle which one you need: the city's Building and Zoning page says it inspects construction within Yerington city limits, and anything outside goes to Lyon County. The same page links a city boundaries map, so check it first.
City of Yerington Building and Planning
The department is at 14 E. Goldfield Ave., 775-463-3511. It issues building, electrical, plumbing, mechanical and demolition permits, checks plans, handles structure moving permits and inspects wood stoves.
The city's building permit application lays out the residential steps:
- Hire a contractor with a City of Yerington business license. All work must be done by such a contractor unless you do the project yourself and sign the enclosed Owner-Builder Affidavit of Exemption.
- Get the Tax Verification form signed by the Lyon County Clerk's office at 27 South Main Street. A permit can't be issued if Lyon County property taxes on the parcel are delinquent.
- Ask the department for the fee. Fees are based on the valuation of the whole project or the bid amount, and all fees are due before the permit issues.
- Submit the application, plans and fees. Residential plan review can take up to ten days.
For commercial work, the application adds a fire review by the Mason Valley Fire District (775-463-2261) before the city will issue the permit, and commercial plan review can take up to ninety days.
Inspections need 24 hours' notice. Keep the stamped plans and the permit on site, and remember the project isn't finished until a city building official signs the final.
Outside city limits: Lyon County
For a home in Mason Valley beyond city limits, call the Lyon County Building Department at 775-463-6591. Lyon County's building FAQ adds a rule specific to this area: in Mason and Smith Valleys, the Walker River Irrigation District must approve the site plan as part of the permit application. County parcels also follow the county's own exempt list, including residential fences up to 7 feet and detached sheds under 200 square feet with no utilities, and the county requires a floodplain development permit before building in a FEMA flood zone.
Water and sewer
Inside the city, water and sewer service applications go through the City of Yerington; its FAQ covers how to apply, and Public Works takes questions at 775-463-3511. Outside the city, a will-serve letter or a well driller's contract is part of any new Lyon County application, per the county's residential information letter.
Contractor licenses
The city business license sits on top of the state license. NRS 624.700 makes it unlawful to contract without an active State Contractors' Board license. Look up the license, its classification and its monetary limit on NSCB License Search, or call the Board's Reno office at (775) 688-1141. Before you sign the owner-builder affidavit, read our owner-builder exemption page. The licensing guide explains classifications, and the unlicensed contractor penalties page explains what happens when a license is missing.
Weather
NOAA's 1991-2020 normals for the Yerington station, available through the National Weather Service's NOWData tool, list just 4.58 inches of precipitation and 3.2 inches of snow a year, the driest of the northern Nevada stations covered here. July highs average 93.4 degrees and January lows 22.7 degrees. That range is hard on evaporative coolers, exterior paint and slab joints.
Find contractors in Yerington
Browse Yerington plumbers, electricians, remodelers in Yerington and concrete contractors.
See our plumbing costs and electrical costs, use the hiring checklist, and request quotes.
Sources
- City of Yerington: Building and Zoning
- City of Yerington: Building Permit Application (PDF)
- City of Yerington: FAQ
- City of Yerington: Public Works
- Lyon County: Frequently Asked Questions
- Lyon County: Building Permits on Residential Lots (PDF)
- National Weather Service Reno: NOWData climate normals
- Nevada Revised Statutes, Chapter 624
- NSCB License Search
Frequently asked questions
Who issues permits for a Mason Valley home outside Yerington?
The Lyon County Building Department, (775) 463-6591. The City of Yerington's Building Department covers only property inside city limits. In Mason and Smith Valleys, Lyon County also requires the Walker River Irrigation District to approve the project's site plan.
Does my contractor need a Yerington business license?
Yes. The city's permit application says all contractors and subcontractors must have a valid City of Yerington business license, and residential work must be done by such a licensed contractor unless the owner does the work under an owner-builder affidavit.
How long does a Yerington residential plan review take?
The city's permit application says residential plan review can take up to ten days. Commercial projects can take up to ninety days and may need Mason Valley Fire District review first.
How do I schedule a Yerington inspection?
Call the Building Department at least 24 hours ahead. Keep the stamped set of plans and the permit on site for every inspection.