The City of Ely Building Department, 501 Mill, (775) 289-2430 or (775) 289-6500, issues permits inside city limits under the 2018 IBC and IRC. It sets each project's snow load by altitude, requires utility clearance letters and an all-weather access road approval for new buildings, and charges double permit fees for work started before the permit issues. Ely averages about 215 nights a year at or below freezing.
Ely's building department sets the snow load for each project by altitude after the application comes in, instead of publishing one number for the whole city. The city runs its own Building Department for property inside city limits, and its permit package asks for utility, fire access and ownership paperwork before a permit issues.
Who issues building permits
The City of Ely Building Department handles permits and inspections inside city limits. Contact the Building and Planning Department manager at (775) 289-2430 or (775) 289-6500, or buildingofficial@cityofelynv.gov. The city's permit package lists the department at 501 Mill, P.O. Box 299, Ely, NV 89301. For an address outside city limits, check with White Pine County before work begins.
What the permit package requires
The city's checklist asks for:
- A completed Building Permit Application with the project address and contacts
- Two copies of a site plan showing the building location, grading and property lines: one for the city, one kept on the job site at all times
- Two copies of building plans in enough detail to show code compliance, handled the same way
- Proof of ownership, or the owner's letter authorizing the permit
- Letters of intent to serve, and letters of clearance, from the utilities, such as the City of Ely Water/Sewer Department and Mt. Wheeler Power
- Copies of any zone change, variance or conditional use permit from the White Pine Regional Planning Commission
- State health approval for any septic system or domestic water system
- The NSCB Owner-Builder Affidavit of Exemption, if you are building as an owner-builder
- All contractor names and license numbers
- An all-weather road approval for emergency vehicle access from the Ely or White Pine County fire chief
Plan review applies to every permit, and a plan review fee is charged on all permits that need review. Work done before the permit is issued is subject to double permit fees. Work on manufactured housing must be approved and inspected by the State of Nevada Manufactured Housing Division.
Inspections
Inspections must be scheduled 24 hours in advance, not counting weekends and holidays. The required list includes footings, foundation, under-slab utilities, rough framing, rough electrical, plumbing and mechanical, insulation, drywall nailing and final. A contractor who covers framing or insulation before the inspection may have to open it back up, so build those stops into the schedule.
Codes and snow load
Ely's building codes page lists:
- 2018 International Building Code or International Residential Code
- 2018 Uniform Mechanical Code and 2018 Uniform Plumbing Code
- 2011 National Electrical Code
- 2018 International Fire Code and 2018 International Energy Conservation Code
- 1997 Uniform Code for the Abatement of Dangerous Buildings
On snow load, the city says it varies: the department verifies it after receiving your application, based on case study for your altitude, and you can contact the department beforehand to help determine it. Ask a roofer or patio cover builder which snow load their design assumes, and have them confirm it with the city before ordering trusses or a kit.
Contractor licenses
Every contractor listed on your permit needs an active Nevada State Contractors' Board license (NRS 624.700); the city's checklist requires each one's license number. Look them up on NSCB License Search, or call the Board at (775) 688-1141. If you plan to build your own home, read the owner-builder exemption, since the affidavit is part of Ely's package. For deposits and payment schedules, see our residential contract guide, and for classifications, the licensing guide.
Weather
The National Weather Service's 2025 Ely Airport climate summary lists 1991-2020 normals of 214.9 nights a year at or below freezing, 15.8 nights at or below zero, 54.1 inches of snow and only 29.2 days at 90 degrees or hotter. Heating systems, insulation and roofs that shed snow are the priority, and exterior work has a short season.
Find contractors in Ely
The directory lists Ely plumbers, electricians in Ely, fence contractors and remodelers in Ely.
Compare bids with our electrical costs and remodeling costs, use the hiring checklist, and get quotes.
Sources
- City of Ely: Building Department and Building Codes
- City of Ely: Building Permit Package (PDF)
- National Weather Service: Ely Airport annual climate summary
- Nevada Revised Statutes, Chapter 624
- NSCB License Search
Frequently asked questions
What building codes does Ely use?
The City of Ely lists the 2018 International Building Code and International Residential Code, 2018 Uniform Mechanical and Plumbing Codes, 2011 National Electrical Code, 2018 International Fire Code, 2018 International Energy Conservation Code, and the 1997 Uniform Code for the Abatement of Dangerous Buildings.
What happens if work starts before the Ely permit is issued?
The city's permit package says any work done before the permit is issued is subject to double permit fees. All plans must be submitted and approved first.
How is snow load set for a building in Ely?
It varies. The Building Department verifies the snow load after it receives your application, based on case study for your altitude. You can contact the department ahead of time to help determine it.