π³Landscaping in Fallon
πͺWindows & Doors in Fallon
Quick answer
Inside Fallon city limits, the City Building Department at 55 W. Williams Avenue, (775) 423-5107, issues permits and inspects work. Outside the city, Churchill County takes all permits through its online portal, requires a permit for accessory buildings of 200 square feet or more and decks 30 inches above grade, and also permits septic systems. Check the county's flood modeling map before adding a structure.
Fallon is an incorporated city in Churchill County, and the city and county run separate building departments. A house in town permits through the City of Fallon; a house on a rural parcel outside city limits permits through the county, which also handles septic systems. Know which side of the line you are on before a contractor prices the job.
Inside city limits: City of Fallon
The City Building Department issues building permits from 55 W. Williams Avenue. Per the city's business licenses and building permits page:
- Download the permit application, fill it out, and bring it to the Building Department.
- Call (775) 423-5107 for permitting requirements, fees, application requirements, review times and inspections.
- The same number schedules the City Building Inspector, follows up on a completed inspection and requests report copies.
- Development plan approvals also start with that number.
The city's homeowner building permits page names the jobs it wants to hear about: building a home or addition, configuring a new sprinkler system, and adding a new building or fence to your lot. Call before any of those starts.
Contractor business licenses in town
The City Clerk's Office, also at 55 W. Williams Avenue, issues business licenses; call (775) 423-5104. Ask any contractor working inside the city whether they hold a City of Fallon business license along with their state license.
Outside city limits: Churchill County
The Churchill County Building Department permits and inspects residential and commercial construction in the unincorporated areas of the county, and permits and inspects septic systems, both new systems and repairs. It now sits inside the county's Public Works, Planning and Building Department, main number (775) 423-7627.
- Applications: all permits are taken through the county's online portal on CitizenServe. Questions can go to buildings@churchillcountynv.gov or (775) 428-0264.
- Fees: permit costs are based on the valuation of construction (permit procedures).
- Scam warning: the county reports emails asking applicants for extra processing payments. Real county emails end in @churchillcountynv.gov, and the county does not request wire transfers.
What needs a county permit
The county's building FAQ lists:
- Accessory buildings and garages of 200 square feet or more. A detached accessory building under 200 square feet needs no permit.
- Covered porches with a solid roof, such as plywood and shingles or metal sheeting. Lattice-covered shade porches generally don't need one.
- Any deck or patio structure 30 inches above grade, which also gets plan review. Ground-level concrete slabs, driveways and wood decks generally don't.
- New construction or repair of a residential septic system.
- Placement of any prefab storage shed, carport or cargo container.
A building permit stays valid for 180 days from issuance or from the last inspection. A septic construction permit is valid for one year.
Flood risk
The City of Fallon's website links Churchill County's interactive flood modeling map, and the county's planning function administers Title 19, Flood Damage Prevention. Before you add a garage, shop or addition, check the map and ask the permit office whether floodplain rules apply to the lot.
Contractor licenses
Anyone bidding or performing contracting work in Nevada needs an active State Contractors' Board license (NRS 624.700). Search the name on NSCB License Search or call the Reno office at (775) 688-1141. On a residential job, the contractor must apply for and obtain the permits (NRS 624.970). If your contractor stops paying suppliers, the notice of right to lien rules decide who can claim against your property, and the Residential Recovery Fund may cover losses from a licensed contractor. The licensing guide covers classifications.
Weather
The National Weather Service does not publish an annual climate report for Fallon, so this page quotes no local normals. Ask your HVAC contractor for a load calculation sized to your house, and ask your concrete contractor how they schedule pours around the season.
Find contractors in Fallon
The directory lists Fallon plumbers, electricians in Fallon, HVAC contractors, Fallon roofers, remodelers, painters in Fallon, fence contractors and concrete contractors.
Check bids with our fencing costs and painting costs, work through the hiring checklist, and get quotes.
Sources
- City of Fallon: Business Licenses and Building Permits
- City of Fallon: Homeowner Building Permits
- Churchill County: Building Department
- Churchill County: Public Works, Planning and Building
- Churchill County: Building Permit Procedures and Application
- Churchill County: Building FAQs
- Nevada Revised Statutes, Chapter 624
- NSCB License Search
Frequently asked questions
Who issues building permits in Fallon?
The City of Fallon Building Department, 55 W. Williams Avenue, (775) 423-5107, for property inside city limits. Unincorporated Churchill County permits go through the county's online portal; the county's Public Works, Planning and Building department answers at (775) 423-7627.
Do I need a permit for a shed in Churchill County?
Not if the detached accessory building is smaller than 200 square feet. Accessory buildings and garages of 200 square feet or more need a permit, and so does placing any prefab storage shed, carport or cargo container.
How long is a Churchill County building permit good for?
180 days from issuance or from the last inspection. A septic construction permit is valid for one year.